Fishery Notice
Category(s):
COMMERCIAL - Herring - Roe: Gill Net
COMMERCIAL - Herring - Roe: Seine
COMMERCIAL - Herring - Roe: Test Fishery
COMMERCIAL - Herring: Spawn on Kelp
COMMERCIAL - Herring - Roe: Seine
COMMERCIAL - Herring - Roe: Test Fishery
COMMERCIAL - Herring: Spawn on Kelp
Subject:
FN0232-COMMERCIAL - Herring - Roe: Strait of Georgia - Update March 11, 2020
ROE HERRING INFORMATION BULLETIN: 33 DATE: March 11, 2020 STRAIT OF GEORGIA AREA 14 Shelter Pt to Cape Lazo-------No recent soundings E.C. Denman Island------------No recent soundings Lambert Ch. to Chrome Is------Mar 9: NFF E.C. Hornby Is----------------Mar 9: 700 tons Tribune Bay/Lower Hornby------Mar 9: 1,600 tons TEST: Mar 9 am on 150 tons 1 nm SE OF Flora Island. 0.0%; 17.7cm; 5m:8f; 2-3-4- 102-3; (0.0gm:85.0gm); Upper Baynes Sd---------------Mar 9: NFF Lower Baynes Sd---------------Mar 11: 1,000 Mapleguard to Nile Cr---------Mar 9: 400 tons Nile Creek to French Cr-------Mar 9: 6,000 tons French Cr to NW Bay-----------Mar 10: 1,800 tons TEST: Mar 9 pm on 200 tons Inside Northwest Bay. 0.0%; 18.3cm; 15m:22f; 1-0-22- 105-1; (0.0gm:69.0gm); Nita Maria. TEST: Mar 8 am on 700 tons Inside Northwest Bay. 9.7%; 18.6cm; 43m:48f; 39-3-6- 23-11; (25.3gm:80.0gm); Denman Isle. TOTAL AREA 14: ~30,000 (peak estimate) - assessment incomplete AREA 17 NORTH Dorcas Pt/Schooner Cove-------Mar 10: 400 tons Inner Nanoose-----------------Not assessed Outer Nanoose-----------------Mar 11: 6,000 tons TEST: Mar 11 am on 300tons 0.25nm E of Nonooa Rock. 11.8%; 16.7cm; 76m:54f; 49- 2-2-1-2; (24.0gm:75.6gm). Nita Maria. Blunden to Neck Point---------Mar 10: 600 tons Neck Pt to Dodd Narrows-------Mar 10: 600 tons TOTAL AREA 17N: ~27,000 tons (peak estimate) - assessment incomplete AREA 17 SOUTH Pylades Channel--------------No recent soundings Porlier Pass ----------------No recent soundings Trincomali Channel-----------No recent soundings Upper Stuart Channel---------No recent soundings Lower Stuart Channel---------No recent soundings Total Area 17S: ~18,000 (peak estimate) -assessment incomplete TOTAL STRAIT OF GEORGIA: ~75,000 tons (peak estimate) - assessment incomplete FSC Harvest has been observed in the Qualicum Bay area and near Chrome Island. Fishers are reminded that there is a 100m ribbon boundary around FSC activities. Failure to observe boundaries may result in Area closures. No spawn flight scheduled for today, next flight tentatively scheduled for Thursday March 12 in the morning. Industry test vessel Nita Maria assessed outer Nanoose for a set this morning. Nita Maria will continue south to look for a set between Blunden Pt. and Neck Pt. today. Industry test vessel Denman Isle moved to Powell River area last night and is assessing the area. Denman Isle will return to the Vancouver Island shoreline tomorrow in the PM. The DFO Platform Canadian Shore sounded 1,000 tons outside of Deep Bay this morning, bird activity near the scallop farm but no spawn. Moving south to look for backup to spawn at Parksville and Qualicum areas. The DFO Management Platform will be leaving the fishing grounds on Thursday March 12, 2020. As described in FN0212 the Strait of Georgia roe herring seine fishery closed at 9:00am March 7. Validated catch is 2,018.862 tons of the 2,024.75 ton quota. As described in FN0202 the Strait of Georgia roe herring gillnet fishery opened at 11:00 hours March 6. Hailed catch to date is approximately 6,800 tons of the 7,215.25 ton TAC. Assessment and tonnage estimates are incomplete. ROE TEST CODE:Date;Location;roe yield;fish size;males:females;#1-#2-#3-#spawned- #juvenile;(roe weight gm:fish weight gm) PUBLIC HEALTH AND AQUACULTURE Vessel Masters are reminded that there are numerous clam and oyster leases in Baynes Sound. Disposal of human waste into waters near shellfish harvest areas creates potentially serious health risks for shellfish consumers. The discharge of untreated sewage into all Canadian inland waters and Canadian coastal waters within 3 nautical miles of land is banned under the Canada Shipping Act. Vessels participating in the herring fishery are required to abide by sewage discharge regulations and are requested to minimize impact to aquaculture sites by utilizing marinas, anchoring in existing sanitary closures and minimizing congregations of vessels near shellfish aquaculture sites as much as possible. NANAIMO HARBOUR NOTICE Please be advised that the WEST side of the concrete pier (Visiting Vessel Pier) is closed to all transient vessel traffic. The west side is the inside of the Pier, the side that runs parallel to the wood dock (S Dock). Under NO circumstances are any transient vessels allowed to tie on that side. This includes CFVs. All CFVs are required to HAIL the Marina Office on VHF Channel 67 or call in by phone at 250-754-5053 for moorage assignment. All CFVS must register with the office, moorage is due upon arrival. FOR MORE INFORMATION: James Meldrum (250) 286-5823 or james.meldrum@dfo-mpo.gc.ca
Fisheries & Oceans Operations Center - FN0232
Sent March 11, 2020 at 1118
Visit Fisheries and Oceans Canada on the Web at http://www.pac.dfo-mpo.gc.ca
Printed from the Pacific Region web site on May 16, 2024 at 2243
- Date modified: